Monday, March 10, 2014

LRT Line 2 East Extension Project

PROJECT DESCRIPTION
  • Extension of the existing LRT Line 2 by 4.19 km. eastward from the existing Santolan Station at Marcos Highway, terminating at the intersection of Marcos Highway and Sumulong Highway. 
  • With two (2) additional stations proposed: (1) Emerald Station in front of Robinsons Place Metro East in Cainta Rizal; and (2) Masinag Station at the Masinag Junction in Antipolo City. 

Proposed stations:
  • Emerald Station in front of Robinson’s Place Metro East in Cainta Rizal
  • Masinag Station at the Masinag Junction in Antipolo City

PROJECT LOCATION
Marcos Highway (Santolan, Pasig City to Masinag, Antipolo City)
PROJECT MAP


IMPLEMENTING AGENCY

  • Department of Transportation and Communications (DOTC)
  • Light Rail Transit Authority (LRTA)

CONTACT PERSON

  • Asec. Jaime Raphael C. Feliciano: +63 2 725 0013
  • Engr. Emil Galvante: +63 927 756 0621

CONSTRUCTION PERIOD

  • July 2014 to January 2016 (Civil Works)
  • November 2014 to June 2016 (Electro-Mechanical Works)

Bonifacio Global City to Ortigas Center Link Road Project (Phase I, IIA)

PROJECT DESCRIPTION

Phase I: 4-lane (2 lanes each direction) bridge with a length of 613.778 meters
Phase IIA: 4-lane (2 lanes each direction) bridge with a length of 497.165 meters
PROJECT LOCATION

Phase I: Sta. Monica - Lawton Bridge
Phase IIA: Lawton to Global City Viaduct
PROJECT MAP
IMPLEMENTING AGENCY
  • Department of Public Works and Highways (DPWH)
CONTACT PERSON
  • Director Virgilio C. Castillo, call +63 2 304 3658
CONSTRUCTION PERIOD
  • Phase I: July 2014 - June 2016
  • Phase IIA: July 2015 - June 2016

EDSA - Taft Ave. Flyover

PROJECT DESCRIPTION

  • 4-lane (2 lanes each direction) 3rd level flyover at the intersection of EDSA and Taft Ave.
  • Length: Northbound - 1,696 meters and Southbound - 1,046 meters

PROJECT LOCATION
Along EDSA from F.B. Harrison to Roxas Boulevard
PROJECT MAP
IMPLEMENTING AGENCY

  • Department of Public Works and Highways (DPWH)

CONTACT PERSON

  • Director Virgilio C. Castillo, call +63 2 304 3658

CONSTRUCTION PERIOD

  • January 2016 – June 2017

C.P. Garcia Ave. (C5) to McKinley Hill Ramp Proposal

PROJECT DESCRIPTION
  • A single lane on-ramp 5.3 km along the median of C5 road and terminates along McKinley Road at McKinley Hills.
  • Widening of Lawton Avenue to 8 lanes in anticipation of heavy traffic.
PROJECT LOCATION
Fort Bonifacio Global City, Makati City
PROJECT MAP
IMPLEMENTING AGENCY
  • Bases Conversion and Development Authority (BCDA)
CONTACT PERSON
  • Mr. Ray Apo +63 917 852 5414
  • Engr. Vergilio De Asis +63 2 421 2433 at +63 918 935 5266
PROJECT OWNER
  • Megaworld Corporation
CONTACT PERSON
  • Call Engr. Dick Montes at +63 917 872 0234 or +63 2 709 1111 loc. 110
CONSTRUCTION PERIOD
  • March 2014 to August 2014

South Super Highway - Repair / Rehabilitation / Improvement of Roads (Cluster A)

PROJECT DESCRIPTION

  • Pavement work (concrete re-blocking) intermittent section
  • Asphalt overlay
  • Sidewalk improvement (paving blocks)
  • Application of reflectorized pavement markings

PROJECT LOCATION
South Super Highway, Makati City, Metro Manila
PROJECT MAP:
IMPLEMENTING AGENCY:
  • Department of Public Works and Highways (DPWH) - NCR
CONTACT PERSON:
  • Director Reynaldo G. Tagudando +63 2 304 3700
CONTRACTOR:
  • Armando U. Khong Hun General Contractor, Inc.
CONSTRUCTION PERIOD:
  • January 2014 to June 2014

NAIA Expressway Phase 2

PROJECT DESCRIPTION
  • 7.15 km, 4-lane elevated expressway
  • Includes construction of toll plaza/6 on ramps and 6 off ramps (with 1 existing off-ramp) starting from Sales Avenue going to Andrews Avenue, Domestic Road, MIA Roads and ends at Macapagal Blvd./Pagcor Entertainment City
PROJECT LOCATION
  • Sales Road to Macapagal Avenue, Cities of Pasay and Parañaque
PROJECT MAP

IMPLEMENTING AGENCY

  • Department of Public Works and Highways (DPWH) - NCR
  • Public-Private Partnership Center of the Philippines (PPP Center)
  • Toll Regulatory Board (TRB)

CONTACT PERSON
  • Engr. Reynaldo G. Tagudando at +63 917 839 1584

PROJECT OWNER

  • San Miguel Corporation (SMC)

CONTRACTOR

  • D.M. Consunji Inc. (DMCI)

CONTACT PERSON

  • Engr. Dwight Taala +63 918 909 1774

CONSTRUCTION PERIOD

  • Phase 2A: January 2014 to May 2015
  • Phase 2B: April 2014 to October 2015

Sunday, March 9, 2014

NLEX - SLEX Above PNR Alignment

PROJECT DESCRIPTION
  • 4-lane 13.5 km elevated expressway that will link NLEX and SLEX, running along Philippine National Railways (PNR) right-of-way

PROJECT LOCATION
  • Terminus of Segment 10 of North Luzon Expressway (NLEX) to the Skyway/South Luzon Expressway (SLEX) passing through C-3 (Caloocan City), Jose Abad Santos St., Blumentritt St., Dimasalang St., Ramon Magsaysay Blvd., Nagtahan St., Quirino Avenue and Buendia Avenue (Makati City)
PROJECT MAP
IMPLEMENTING AGENCY
  • Department of Transportation and Communications (DOTC)
  • Philippine National Railways (PNR)
CONTACT PERSON
  • Call Assistant Secretary Jaime Raphael C. Feliciano at +63 2 725 0013
CONSTRUCTION PERIOD
  • January 2014 – December 2017 (Design and Construction Period)

Metro Manila Skyway Stage 3 (SLEX - NLEX Connector)

PROJECT DESCRIPTION
  • 6-lane (2x3 lanes) fully elevated expressway with a length of 14.8 kilometer
  • With 8 interchanges/ramps:
    • Buendia
    • Plaza Dilao
    • E. Rodriguez
    • Sgt. Rivera
    • Pres. Quirino
    • Aurora Blvd.
    • Quezon Ave.
    • Balintawak
  • Alignment:
    • Osmeña Highway
    • Pres. Quirino to Plaza Dilao
    • V. Mapa, N. Domingo in Sta. Mesa
    • G. Araneta Ave. crosses Aurora Blvd., E. Rodriguez and Quezon Ave.
    • Sgt. E. Rivera
    • A.Bonifacio towards Balintawak
PROJECT LOCATION
Buendia, Makati City to Balintawak, Quezon City
PROJECT MAP
  • IMPLEMENTING AGENCY: Department of Public Works and Highways (DPWH) and Toll Regulatory Board (TRB)
  • CONTACT PERSON: Efren U. Rabot at +63 920 945 2632 and +63 2 631 4673 loc. 4749
  • PROJECT OWNER: Citra Central Expressway Corporation
  • CONTACT PERSON: Anna Gamboa at +63 917 840 1373 (CORPCOM)
  • CONTRACTOR: D.M. Consunji Inc. (DMCI)
  • CONTACT PERSON: Engr. Nilo Rey at +63 906 310 4023
  • CONSTRUCTION PERIOD
    • Section 1 (Advance Work) - March – April 2014
    • Section 1 - April 2014 – December 2015
    • Section 2 - April 2014 – June 2017
    • Section 3 - April 2014 – December 2015
    • Section 4 - April 2014 – June 2017

Magallanes Interchange - Repair, Strengthening, Asphalt Overlay

PROJECT DESCRIPTION
  • Asphalt overlay of the third level flyover (along EDSA) and a second level interchange from abutment to abutment (to be divided by into five (5) stages which will be implemented one (1) stage at a time
  • Removal and replacement of damaged expansion dam
  • Strengthening/retrofitting of the deckslab (soffit) of the second level interchange and the inner lane of the third-level flyover (Pasay-bound)
PROJECT LOCATION

Magallanes, Makati City

PROJECT MAP


  • IMPLEMENTING AGENCY: Department of Public Works and Highways (DPWH) - NCR
  • CONTACT PERSON: Call Reynaldo G. Tagudando at +63 2 304 3700
  • CONTRACTOR: J.D. Legaspi Construction
  • CONSTRUCTION PERIOD
    • Phase 2A: Jan 2014 - May 2015
    • Phase 2B: Apr 2014 - Oct 2015


Thursday, May 12, 2011

Albert, Arum asked to appear at Manila court

 The lawyer-president of the United Nations National Anthem Foundation has asked a Manila regional trial court judge to order Brazilian composer-arranger Morris Albert and his co-defendant Bob Arum, manager of world boxing champ Saranggani Rep. Manny Pacquiao, to bring the original copy of the “bastardized version” of the Philippine National Anthem before the court on May 20.


Lawyer Crisanto Soldevilla Cornejo filed on May 6 with Manila RTC Presiding Judge Dinnah Agulla-Topacio “A Supplemental and Reiterating Very Urgent Motion” for the issuance of a subpoena through the Brazilian embassy in Manila, directing Albert and Arum to appear in court at 2 p.m. on May 20.


In the two-page motion, Cornejo urged the court to direct Albert and Arum to answer the amended complaint together with the Kapisanan ng mga Brodkaster sa Pilipinas (KBP) and other five defendants who bastardized and violated the country’s National Anthem, “Lupang Hinirang.” Cornejo also asked the court to resolve the motion to dismiss filed by the Office of the Solicitor General and the motion to cite in contempt of court the officers and counsel of KBP for misleading the court that 10,000 copies of the CD that five pop-singers bastardized were already in the custody of the National Library.


The KBP counsel earlier testified in court that 10,000 CDs were already deposited in the National Library. He called on the court to issue subpoena duces tecum against Albert and Arum who were mandated by the court to appear in the continuation of the trial of the case on May 20 and June 3.


He said Albert and Arum should show cause why they should not be cited in contempt of court or “as soon thereafter as Court may schedule the trial dates addressed to the Office of the Brazilian ambassador to the Philippines-His Excellency Alcides Gastao Rostand Prates, Embassy of the Federative Republic of Brazil.


Bastardized version


Cornejo said he filed their latest motion on behalf of the Philippine Historical Commission, also named as a plaintiff in the case which was included by the judge in the list of cases for Judicial Dispute Resolution.


Maria Serena Diokno, also the chairperson of the National Historical Commission of the Philippines, was furnished a copy of the “very urgent motion.” The alleged “bastardized” version of Lupang Hinirang was sung by Martin Nievera at the start of the bout between Pacquiao and Ricky Hatton at the MGM Grand Garden Arena in Las Vegas on May 3, 2009.


In objecting to Nievera’s rendition of the Philippine National Anthem, the NHCP cited Section 37 of Republic Act No. 8491 (1998 Flag and Heraldic Code of the Philippines) which provides that the “rendition of the National Anthem, whether played or sung, shall be in accordance with the musical arrangement and composition of Julian Felipe.”


When it is heard, stand upright, facing the flag, and place the right hand on the left chest while singing.


But the anthem may be played during the following: international competitions where the Philippines is the host or has a representative; local competitions; during the “signing off” and “signing on” of radio broadcasting and television stations; before the initial and last screening of films and before the opening of theater performances and other occasions as may be allowed by the Institute.


The Oath of Patriotism (Panatang Makabayan) must be recited after the singing of the national anthem in basic education institutions. The Pledge of Allegiance (Panunumpa ng Katapatan sa Watawat ng Pilipinas) may be recited as well, though the law did not specify who is required to do so.


Section 20 of the law also states: “The observance of the flag ceremony in official or civic gatherings shall be simple and dignified and shall include the playing or singing of the anthem in its original Filipino lyrics and march tempo.”


When Nievera belted out Lupang Hinirang, it started slowly, took on a martial beat in the middle, and then finally ended on a sustained high note. The same law punishes failure or refusal to observe the provisions of the code with public censure, “which shall be published at least once in a newspaper of general circulation. The guilty person may be fined up to P5,000 or imprisoned for not more than a year, or “be meted with both penalties, at the discretion of the court.”


All citizens to stand at attention and sing with fervor, as a sign of respect, when the National Anthem is played at public gatherings.


Even moviegoers who do not stand up when the National Anthem is being played in cinemas will be sanctioned, as it empowers the security personnel and ushers in movie houses to arrest a violator and summon law enforcement officers to assist in conducting citizens' arrests.


But Nievera has maintained he did nothing wrong, and he is unrepentant. He insisted he interpreted the song the way he “understood” it. The NHI has also slammed the performance by Sarah Geronimo, Lani Misalucha, and Bituin Escalante of “Lupang Hinirang” during the past boxing bouts of the number one pound-for-pound fighter in the world.


On October 4 last year, the House of Representatives approved House Bill No. 465 or “An Act Prescribing the Code of the National Flag, Anthem, Motto, Coat-of-Arms and Other Heraldic Items and Devices of the Philippines.”


Aside from the National Anthem, the bill also seeks to protect the Philippine flag and other heraldic items of the country.


Under the House-approved measure, a P 100,000 fine and two-year imprisonment await a performer who will deviate from the official musical arrangement of “Lupang Hinirang” as composed by Julian Felipe.


“Lupang Hinirang” should be sung in a marching-type tempo, within the range of 100 to 120 metronome, in 4/4 beat and 2/4 beat when played, the bill said.


Several popular singers, among them Journey’s Arnel Pineda, Martin Nievera, and the all-female group La Diva had been criticized for their renditions of the country’s national anthem, both during the fights of Filipino boxing icon and Sarangani Rep. Manny Pacquiao.


http://www.philstar.com/metro/684720/albert-arum-asked-appear-manila-court