Sunday, July 31, 2022

unified grand central station upsate today 7-31-22||buong buo na talaga|...

Wow,nasa 12th span na!PNR NSCR UPDATE MEYCAUAYAN STATION | JULY 31, 202...

Province Mass for the Solemnity of St. Ignatius of Loyola

mrt line 7 MANGGAHAN STATION Update today|july 31 2022 |RUEL'S TV

WOW! BINILISAN NA!NLEX-SLEX CONNECTOR ROAD PROJECT(JULY 31,2022)|buildbu...

North EDSA Common Station/Unified Grand Central Station Update | July 31...

NLEX-SLEX CONNECTOR ROAD PROJECT HERMOSA ST | Latest Update

ANG PAGLULUNSAD NG HUBILEO NI SAN ISIDRO LABRADOR

Saturday, July 30, 2022

PNR ROW PINAKAMALAWAK DITO! WIPE OUT DIN STREET DWELLERS!NLEX-SLEX CONN ...

LIVE: Ika-18 Linggo sa Karaniwang Panahon - 6PM MASS

AERIAL VIEW! BAGONG BAHAY NG BAGON NANDITO NA! LRT1 CAVITE SOUTH EXTENSI...

UNIFIED GRAND CENTRAL STATION UPDATE | JUKY 30, 2022

HOLY MASS: July 30, 2022, Second Day of Novena in Honor of St. Dominic D...

RIDE RADIO | JULY 30, 2022

Buhay Baranggay Hosted By: Sonny Ilustre - July 30, 2022

JULY 30,2022 SATURDAY 8AM ONRAMP OFFRAMP UPDATE QUIRINO AVENUE

LIVE: Mass in Honor of Our Lady of Antipolo - 12NN MASS

NLEX-SLEX CONNECTOR ROAD PROJECT ESPAÑA MANILA Latest Update

LRT 1 CAVITE EXTENSION UPDATE | DR. A. SANTOS STATION | JUKY 30, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT BLUMENTRITT MANILA Latest Update

MANAOAG MASS - Saturday Memorial of the Blessed Virgin - July 30, 2022 /...

NLEX-SLEX CONNECTOR ROAD PROJECT C3 ROAD Latest Update

WOW!Ang bilis!Metro Manila Skyway Stage 3 update (JULY 29,2022)| QUIRINO...

Friday, July 29, 2022

WATCH: The Chatroom (July 29, 2022)

MGA POSTE AABOT NA SA ALTURA, STA MESA! NLEX-SLEX CONNECTOR ROAD,JULY 29...

NLEX-SLEX CONNECTOR ROAD PROJECT BLUMENTRITT MANILA | Latest Update

HOLY MASS: July 29, 2022, First Day Novena in Honor of St. Dominic

Baclaran Church Live: Triduum for the Feast of St. Alphonsus Maria de L...

JULIUS AND TINTIN | JULY 29, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT HERMOSA ST | Latest Update

NLEX-SLEX Connector Road Project! ESPAÑA BVLD./Antipolo Street Update | ...

NLEX-SLEX CONNECTOR ROAD PROJECT(JULY 28,2022)|buildbuildbuild| RickzCalTV

LRT 1 CAVITE EXTENSION | RAILWAYS INSTALLATION UPDATE | JULY 29, 2022

mrt line 7 TANDANG SORA STATION Update today||july 29 2022||RUEL'S TV

MRT 7 UPDATE MANGGAHAN STATION COMMONWEALTH |JULY 29, 2022 |build build ...

MRT 7 UPDATE DON ANTONIO STATION COMMONWEALTH JUNE 29, 2022 | build buil...

PANOORIN: Public Briefing #LagingHandaPH | July 29, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT UPDATE | JULY 29, 2022

MANAOAG MASS - Memorial of Saints Martha, Mary, and Lazarus - July 29, 2...

NLEX-SLEX CONNECTOR | NAKU PO! TODO ARANGKADA NA! | UPDATE JULY 29, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT #buildbuildbuild #dpwh #dotr #pnr #naia...

Gising Na! (29 July 2022)

Thursday, July 28, 2022

NLEX-SLEX CONNECTOR: WOW! RAMPAHAN ANTIPOLO ST., SAMPALOC | INU-UMPISAHA...

LIVE: Huwebes ng Ika-17 Linggo sa Karaniwang Panahon - 6PM MASS

North EDSA Common Station/Unified Grand Central Station Update | July 28...

NLEX SLEX CONNECTOR PROJECT HERMOSA ST.UPDATE JULY 28 2022 Latest Update...

WOW! MAY SCAFFOLDING NA!|NLEX-SLEX CONNECTOR ROAD PROJECT(JULY 28,2022)|...

JULIUS AND TINTIN | JULY 28, 2022

Sos: Serbisyo, Ora-Mismo, Sigurado July 28, 2022 - Hosted By Johnny Gomez

MRT-7 Project! Manggahan Station Update | July 28, 2022

MRT-7 Project! Don Antonio and Batasan Station Update | July 28, 2022

MALAKING PAGBABAGO | QUIRINO INTERCHANGE | PLAZA DILAO | QUIRINO AVE. | ...

PANOORIN: Public Briefing #LagingHandaPH | July 28, 2022

LIVE: Thursday of the Seventeenth Week in Ordinary Time - 12NN MASS

Bubong patapos na!UNIFIED GRAND CENTRAL STATION UPDATE | JULY 28, 2022 |...

NLEX-SLEX CONNECTOR ROAD PROJECT(JULY 28,2022)|buildbuildbuild| RickzCalTV

NLEX-SLEX CONNECTOR ROAD PROJECT HERMOSA ST | Latest Update

NLEX-SLEX CONNECTOR ROAD PROJECT C3 ROAD | Latest Update

July 28, 2022 10:00AM Online Mass & Novena verse25 Thursday of the Seven...

Wednesday, July 27, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT ESPAÑA MANILA | Latest Update

NLEX-SLEX CONNECTOR: SIMOUN ST., Cr., Antipolo St.| Ang Bilis Ng Progres...

PANG ANIM NA PIER HEADS NG OFF-RAMP KINAKASA NA | QUIRINO INTERCHANGE | ...

LIVE: Miyerkules ng Ika-17 Linggo sa Karaniwang Panahon - 6PM MASS

NLEX-SLEX CONNECTOR ROAD PROJECT BLUMENTRITT MANILA | Latest Update

LRT 1 CAVITE EXTENSION UPDATE | JULY 27, 2022

JULIUS AND TINTIN | JULY 27, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT HERMOSA ST | Latest Update

Sos: Serbisyo, Ora-Mismo, Sigurado - Replay - July 27, 2022 - Hosted By ...

NLEX-SLEX CONNECTOR ROAD PROJECT UPDATE | JULY 27, 2022

QUIRINO AVENUE ON RAMP OFF RAMP UPDATE JULY 26, 2022 TUESDAY 7am

NLEX-SLEX CONNECTOR ROAD PROJECT C3 ROAD | Latest Update

mrt line 7 BATASAN/DON ANTONIO STATION|RAIL INSTALLATION lagpas batasan ...

WATCH: President Ferdinand "Bongbong" Marcos Jr. press briefing at Malac...

NLEX SLEX CONNECTOR UPDATE HERMOSA ST. JULY 27 2022 [Build build build P...

LIVE: Wednesday of the Seventeenth Week in Ordinary Time - 12NN MASS

UNIFIED GRAND CENTRAL STATION UPDATE JULY 27 2022 [Build build build Pro...

PANOORIN: Public Briefing #LagingHandaPH | July 27, 2022

ESPAÑA BOULEVARD NLEX-SLEX CONNECTOR ROAD PROJECT UPDATE

3 GIRDERS NA INSTALL AGAD!NLEX-SLEX CONNECTOR ROAD PROJECT(JULY 27,2022)...

PANOORIN: Press briefing with Press Secretary Atty. Trixie Cruz-Angeles ...

NLEX-SLEX CONNECTOR ROAD #buildbuildbuild #dpwh #dotr #pnr #naia #ports ...

Baclaran Church Live: Wednesday of the Seventeenth Week in Ordinary Time

Tuesday, July 26, 2022

NLEX-SLEX CONNECTOR: Mga Nakatira Sa Tabing Riles, Pina-Aalis Na!

LIVE: Paggunita kina San Joaquin at Santa Ana, mga magulang ng Mahal na ...

NLEX-SLEX CONNECTOR ROAD PROJECT BLUMENTRITT MANILA | Latest Update

UNIFIED GRAND CENTRAL STATION | Latest Update

LRT 1 CAVITE EXTENSION UPDATE | MIA/REDEMPTORIST/NINOY AQUINO STATION UP...

Wow, moving to 5th span na!PNR NSCR UPDATE APALIT STATION | JULY 25, 20...

AERIAL FOOTAGE NLEX-SLEX CONNECTOR ROAD #buildbuildbuild #dpwh #dotr #pn...

WATCH: The Post-SONA Economic Briefing | July 26, 2022

MALL OF ASIA COMPLEX EXPANSION?? Pasay City Reclamation Project UPDATE

Nasa brgy San Pablo na!PNR NSCR UPDATE MALOLOS STATION | JULY 26, 2022 |...

NLEX-SLEX CONNECTOR ROAD PROJECT C3 ROAD | Latest Update

Archdiocesan Shrine of St. Anne

Monday, July 25, 2022

Archdiocesan Shrine of St. Anne

SKYWAY STAGE3 | ON-RAMP/OFF-RAMP | PRES.QUIRINO AVE., Cr., OSMEÑA HI-WAY

Fullblast na din!PNR NSCR UPDATE CALUMPIT STATION | JULY 25, 2022 |buil...

MRT-7 Project! QMC Tunnel/Underground Station Update | July 25, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT HERMOSA ST | Latest Update

North EDSA Common Station/Unified Grand Central Station Update | July 25...

WATCH: State of the Nation Address of President Ferdinand Romualdez Marc...

WOW FULLBLAST NA ||mrt line 7 MANGGAHAN STATION update today||7-25-22||R...

NLEX-SLEX CONNECTOR ROAD PROJECT C3 ROAD | Latest Update

LRT 1 CAVITE EXTENSION UPDATE TODAY | JULY 25, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT #buildbuildbuild #dpwh #dotr #pnr #naia...

PANOORIN: Public Briefing #LagingHandaPH | July 25, 2022

ISA NA LANG WIPED OUT NA, SOLIS TO HERMOSA | NLEX-SLEX CONNECTR ROAD GRO...

MANAOAG MASS - Feast of Saint James the Great, Apostle - July 25, 2022 /...

19th Congress 1st Regular Session #01

Family Appointment with EL SHADDAI July 25, 2022 Mon - Healing Message

Sunday, July 24, 2022

LRT 1 EXTENSION BACLARAN TO CAVITE REDEMPTORIST STATION HAHAKBANG NA SA ...

MIA STATION UPDATE LRT1 CAVITE EXTENSION PROJECT #lrt1caviteextensionupdate

Archdiocesan Shrine of St. Anne

NINOY AQUINO STATION UPDATE LRT1 CAVITE EXTENSION PROJECT #lrt1caviteext...

NLEX-SLEX CONNECTOR ROAD PROJECT UPDATE

NLEX-SLEX Connector Road Project! Hermosa Street Update | July 24, 2022

The Former Harrison Plaza sa Maynila Tatayuan ng Residential and Commerc...

unified grand central station ||wow column kumpleto na ganito na pala sa...

NLEX-SLEX Connector Road Project! C3 Road/Caloocan Interchange Update | ...

PANG WORLD CLASS ANG DATING ! PUNO NG MGA BAGONG GUSALI ! BAY CITY - PAR...

Sunday Mass at the Manila Cathedral - July 24, 2022 (10:00am)

NLEX-SLEX CONNECTOR ROAD PROJECT BLUMENTRITT MANILA | Latest Update

NLEX-SLEX Connector Update..

Saturday, July 23, 2022

[JUL. 23, 2022] 30TH ANNIVERSARY OF MINOR BASILICA OF SAN LORENZO RUIZ

SM CITY CEBU EXPANSION UPADTE JULY 23,2022.

Wow Ganito na pala dito Skyway Stage 3 Quirino Avenue Update July 23 202...

Archdiocesan Shrine of St. Anne

LIVE: Ika-17 Linggo sa Karaniwang Panahon - 6PM MASS

DOUBLE TIME NA SILA, MARAMI NA RIN COLUMNS SA FAJARDO AREA | NLEX-SLEX C...

RIDE RADIO | JULY 23, 2022

GIBAAN NA SA MISMONG PNR RIGHT OF WAY!MAY GINAWA PALA S TRACK!NLEX-SLEX ...

North EDSA Common Station/Unified Grand Central Station Update | July 23...

NLEX-SLEX CONNECTOR ROAD PRPJECT UPDATE | BLIMENTRITT | JULY 23, 2022

Nlex Slex Connector Blumentritt Update July 23 2022, Build build build P...

NLEX-SLEX Connector Road Project! Hermosa Street Update | July 23, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT ESPAÑA MANILA | Latest Update

NAKO GANITO NA PALA ANG MRT7 KUNTING KIMBOT NALANG

PARQAL ASEANA CITY (BGC HIGH STREET OF MANILA BAY )

NLEX-SLEX CONNECTOR ROAD PROJECT HERMOSA ST | Latest Update

LIVE: Mass in Honor of Our Lady of Antipolo - 12NN MASS

NLEX-SLEX CONNECTOR ROAD PROJECT C3 ROAD | Latest Update

NLEX-SLEX CONNECTOR ROAD PROJECT BLUMENTRITT MANILA | Latest Update

NLEX-SLEX CONNECTOR | P.U.P., STA.MESA & PANDACAN-STA.MESA BRIDGE | UPDA...

MANY HOUSES HAVE BEEN DEMOLISHED..NLEX-SLEX CONNECTOR PROJECT UPDATE

MANAOAG MASS - Memorial of the Blessed Virgin Mary on Saturday/July 23, ...

LRT 1 CAVITE EXTENSION UPDATE

China Harbour project faces labor complaints over unpaid wages

By ROY C. MABASA


China Harbour Engineering Company (CHEC), one of China’s state-owned entities engaged in several infrastructure projects in the Philippines, is facing a string of labor complaints due to alleged non-payment of salaries and wages of workers who were tapped to construct segments of the Cavitex C5 Link Expressway.


These are just some of the issues that China Harbour has been dealing with, which have led to an ongoing investigation by the Department of Labor and Employment (DOLE) for possible violations of Philippine labor laws, specifically on the non-payment of wages to construction workers.


Aside from China Harbour, also named as co-respondents in the complaints filed by Filipino construction workers before the DOLE Manila Field offices were the A.M. Oreta & Co and Abyan Management, one of the service providers supplying the manpower needs of the P8.8 billion project.


Both China Harbour and A.M. Oreta were handpicked by Cavitex Infrastructure Corporation (CIC), the concessionaire of the twin road projects which are supposedly due for completion in the second quarter of 2022.


Sources at the labor office said they have received more or less 29 individual complaints while more than two dozen other workers opted to air their complaints over the radio program of now Senator Raffy Tulfo.


Documents obtained by Politiko showed that most of the complaints are still undergoing the Single Entry Approach (SENA) at the DOLE office, a process to enable both parties to reach amicable settlement.


However, some complainants have opted to elevate their cases to the National Labor Relations Commission (NLRC) due to the alleged inability of China Harbour and its co-respondents to show “good faith” in settling the issue of non-payment of wages.


All in all, the total number of complaints, including those reportedly lodged through the barangays, could reach up to more than 60.


Sources said China Harbour’s alleged unsettled fees and wages with the workers and the service providers are estimated to reach more than PhP100 million.


China Harbour is the subsidiary of the China Communications Construction Co., one of the 24 Chinese firms and targeted individuals blacklisted by the United States government for their alleged involvement over the building of artificial islands in the South China Sea.


https://politics.com.ph/2022/07/23/china-harbour-project-faces-labor-complaints-over-unpaid-wages/

Friday, July 22, 2022

NLEX-SLEX CONNECTOR ROAD PROJECT C3 ROAD | Latest Update

NLEX-SLEX CONNECTOR ROAD PROJECT UPDATE(JULY 22,2022)|buildbuildbuild| R...

WATCH: The Chatroom (July 22, 2022)

Archdiocesan Shrine of St. Anne

LIVE UPDATE: NLEX-SLEX CONNECTOR ROAD PROJECT #dpwh #dotr

JULIUS AND TINTIN | JULY 22, 2022

MRT-7 Project! Don Antonio and Batasan Station Update | July 22, 2022

UNIFIED GRAND CENTRAL STATION | Latest Update

NLEX-SLEX CONNECTOR ROAD PROJECT ESPAÑA MANILA | Latest Update

NLEX-SLEX CONNECTOR ROAD PROJECT UPDATE | ANTIPOLO STREET STA. CRUZ MANILA

Sos: Serbisyo, Ora-Mismo, Sigurado July 22, 2022 - Hosted By Johnny Gomez

LRT1 Cavite Extension update And 2nd Dose Booster(July 22,2022)|buildbui...

UNIFIED GRAND CENTRAL STATION UPDATE JULY 22 2022, BUILD BUILD BUILD PRO...

mrt line 7 DON ANTONIO STATION update today|abot na ng batasan station a...

LIVE: Feast of Saint Mary Magdalene - 12NN MASS

NLEX-SLEX CONNECTOR ROAD PROJECT HERMOSA ST | Latest Update

NLEX-SLEX CONNECTOR ROAD PROJECT #buildbuildbuild #dpwh #dotr #pnr #naia...

NLEX-SLEX CONNECTOR ROAD PROJECT BLUMENTRITT MANILA | Latest Update

SOIL TESTING FULL BLAST NA, ALONG ROAD 10 |buildbuildbuild| RickzCalTV

OMG!! WASAK NA ANG MGA BAHAY SA MINDANAO STREET UNTI UNTI NG INUUMPISAH...

NLEX SLEX SKYWAY CONNECTOR ROAD OF RIGTH WAY UNDER NEGOTIATION! D. TUAZO...

Thursday, July 21, 2022

SM City Cebu expansion to start in August

MORE employment and educational opportunities await Cebuanos as the expansion of SM City Cebu in Barangay Mabolo, Cebu City will include business process outsourcing (BPO) facilities and a university.


Project head Aris Angeles told SunStar Cebu Thursday, July 21, 2022, that the expansion of SM City Cebu is targeted to begin in August after all necessary permits will be granted.


Angeles said that aside from the shopping mall expansion, the project will also include the development of a new parking area located in the establishment's north wing.


A campus of the Manila-based school, National University, will also be constructed above the mall's parking area, he added.


Aside from this, Angeles said two towers will also be built and these can be used as workplaces for the city's booming BPO industry.


Angeles said he cannot divulge right now the total cost of the project but he said the company is pouring billions of pesos into the development.


On Wednesday, July 20, the Environment Management Bureau conducted a public hearing as a requirement before the issuance of an environmental compliance certificate for the project. (IRT)


https://www.sunstar.com.ph/article/1935600/cebu/local-news/sm-city-cebu-expansion-to-start-in-august

Breathtaking Manila City (A Scenic View from Above) Full HD Drone Footage

NLEX SLEX CONNECTOR BLUMENTRITT JULY 21 2022 UPDATE. BUILD BUILD BUILD P...

NLEX-SLEX CONNECTOR | SIMOUN ST., Cr., Antipolo St., | UPDATE JULY 21, 2022

SOUTH COMMUTER RAIL, DAMI PANG BAHAY DITO!PNR TRACK SA NICHOLS INTERCHANGE

Archdiocesan Shrine of St. Anne

JULIUS AND TINTIN | JULY 21, 2022

MRT-7 Project! QMC Tunnel/Underground Station Update | July 21, 2022

Sos: Serbisyo, Ora-Mismo, Sigurado July 21, 2022 - Hosted By Johnny Gomez

UNIFIED GRAND CENTRAL STATION UPDATE | JULY 21, 2022

NLEX-SLEX CONNECTOR | ALTURA EXT., STA.MESA |UPDATE JULY 21, 2022

EDSA-North Avenue Common Station/Unified Grand Central Station Update | ...

LIVE: Thursday of the Sixteenth Week in Ordinary Time - 12NN MASS

NLEX-SLEX CONNECTOR ROAD PROJECT HERMOSA ST | Latest Update

ANG PLANO NI PBBM SA BUILD BUILD BUILD PROJECT| NLEX-SLEX CONNECTOR UPDATE

NLEX-SLEX CONNECTOR ROAD PROJECT C3 ROAD | Latest Update

PANOORIN: Public Briefing #LagingHandaPH | July 21, 2022

July 21, 2022 10:00AM Online Mass & Novena Thursday of the Sixteenth W...

SM Mall of Asia Redevelopment


New SM Store Signage




The new site to get your parking ticket in the South Parking Building is on the 4th Floor



West Elevator/Escalator Lobby, South Parking Building


Needs more seating and a possible airconditioning in the lobby




Leading towards to the Upper Deck of the Southwest Bridge to Main Mall


The 3rd Floor outdoor connection between South Entertainment Mall and Southwest Main Mall


And the connection to Southeast Main Mall


As of yesterday, It's still cordoned off leading to the 3rd Floor of Entertainment Mall







The last remaining 2006-era signage


The corridor leading to the North Entertainment Mall from Northwest Main Mall is closed due to renovation


The rest of Northwest Main Mall is boarded up



Rainbow Alley


The former skylight in the Central Atrium now covered due to the upcoming football field


The Main Mall Glass Atrium


The facade of Northeast Main Mall (the rebars on the left side)


The Glass Atrium from the outside looks like the Northeast Side will cover the bare areas of the atrium


The escalators remained the same


CLN MOA Opening on September 2022.


The new escalator leading to the 3rd Floor in Southeast Main Mall


At the 3rd Floor Southeast Main Mall





At the upper deck of the Southeast Bridge leading to South Parking Building



MOA Square







The bridgeway leading to SMX


I wonder if the next Southern Expansion of Entertainment Mall will have SM Game Park and Park Inn by Radisson on top



At South Entertainment Mall








More stalls on the Ground Floor



Nathan's Famous will have its second Pasay Branch by August 2022



Music Hall



At the staircase



Old tilings are still present. The MOA of 2006 will be gone.



Dohtonbori MOA will reopen by September 2022