Monday, March 10, 2014

LRT Line 2 East Extension Project

PROJECT DESCRIPTION
  • Extension of the existing LRT Line 2 by 4.19 km. eastward from the existing Santolan Station at Marcos Highway, terminating at the intersection of Marcos Highway and Sumulong Highway. 
  • With two (2) additional stations proposed: (1) Emerald Station in front of Robinsons Place Metro East in Cainta Rizal; and (2) Masinag Station at the Masinag Junction in Antipolo City. 

Proposed stations:
  • Emerald Station in front of Robinson’s Place Metro East in Cainta Rizal
  • Masinag Station at the Masinag Junction in Antipolo City

PROJECT LOCATION
Marcos Highway (Santolan, Pasig City to Masinag, Antipolo City)
PROJECT MAP


IMPLEMENTING AGENCY

  • Department of Transportation and Communications (DOTC)
  • Light Rail Transit Authority (LRTA)

CONTACT PERSON

  • Asec. Jaime Raphael C. Feliciano: +63 2 725 0013
  • Engr. Emil Galvante: +63 927 756 0621

CONSTRUCTION PERIOD

  • July 2014 to January 2016 (Civil Works)
  • November 2014 to June 2016 (Electro-Mechanical Works)

No comments:

Post a Comment