PROJECT DESCRIPTION
Magallanes, Makati City
PROJECT MAP
- Asphalt overlay of the third level flyover (along EDSA) and a second level interchange from abutment to abutment (to be divided by into five (5) stages which will be implemented one (1) stage at a time
- Removal and replacement of damaged expansion dam
- Strengthening/retrofitting of the deckslab (soffit) of the second level interchange and the inner lane of the third-level flyover (Pasay-bound)
Magallanes, Makati City
PROJECT MAP
- IMPLEMENTING AGENCY: Department of Public Works and Highways (DPWH) - NCR
- CONTACT PERSON: Call Reynaldo G. Tagudando at +63 2 304 3700
- CONTRACTOR: J.D. Legaspi Construction
- CONSTRUCTION PERIOD
- Phase 2A: Jan 2014 - May 2015
- Phase 2B: Apr 2014 - Oct 2015