Sunday, March 9, 2014

NLEX - SLEX Above PNR Alignment

PROJECT DESCRIPTION
  • 4-lane 13.5 km elevated expressway that will link NLEX and SLEX, running along Philippine National Railways (PNR) right-of-way

PROJECT LOCATION
  • Terminus of Segment 10 of North Luzon Expressway (NLEX) to the Skyway/South Luzon Expressway (SLEX) passing through C-3 (Caloocan City), Jose Abad Santos St., Blumentritt St., Dimasalang St., Ramon Magsaysay Blvd., Nagtahan St., Quirino Avenue and Buendia Avenue (Makati City)
PROJECT MAP
IMPLEMENTING AGENCY
  • Department of Transportation and Communications (DOTC)
  • Philippine National Railways (PNR)
CONTACT PERSON
  • Call Assistant Secretary Jaime Raphael C. Feliciano at +63 2 725 0013
CONSTRUCTION PERIOD
  • January 2014 – December 2017 (Design and Construction Period)

Metro Manila Skyway Stage 3 (SLEX - NLEX Connector)

PROJECT DESCRIPTION
  • 6-lane (2x3 lanes) fully elevated expressway with a length of 14.8 kilometer
  • With 8 interchanges/ramps:
    • Buendia
    • Plaza Dilao
    • E. Rodriguez
    • Sgt. Rivera
    • Pres. Quirino
    • Aurora Blvd.
    • Quezon Ave.
    • Balintawak
  • Alignment:
    • OsmeƱa Highway
    • Pres. Quirino to Plaza Dilao
    • V. Mapa, N. Domingo in Sta. Mesa
    • G. Araneta Ave. crosses Aurora Blvd., E. Rodriguez and Quezon Ave.
    • Sgt. E. Rivera
    • A.Bonifacio towards Balintawak
PROJECT LOCATION
Buendia, Makati City to Balintawak, Quezon City
PROJECT MAP
  • IMPLEMENTING AGENCY: Department of Public Works and Highways (DPWH) and Toll Regulatory Board (TRB)
  • CONTACT PERSON: Efren U. Rabot at +63 920 945 2632 and +63 2 631 4673 loc. 4749
  • PROJECT OWNER: Citra Central Expressway Corporation
  • CONTACT PERSON: Anna Gamboa at +63 917 840 1373 (CORPCOM)
  • CONTRACTOR: D.M. Consunji Inc. (DMCI)
  • CONTACT PERSON: Engr. Nilo Rey at +63 906 310 4023
  • CONSTRUCTION PERIOD
    • Section 1 (Advance Work) - March – April 2014
    • Section 1 - April 2014 – December 2015
    • Section 2 - April 2014 – June 2017
    • Section 3 - April 2014 – December 2015
    • Section 4 - April 2014 – June 2017

Magallanes Interchange - Repair, Strengthening, Asphalt Overlay

PROJECT DESCRIPTION
  • Asphalt overlay of the third level flyover (along EDSA) and a second level interchange from abutment to abutment (to be divided by into five (5) stages which will be implemented one (1) stage at a time
  • Removal and replacement of damaged expansion dam
  • Strengthening/retrofitting of the deckslab (soffit) of the second level interchange and the inner lane of the third-level flyover (Pasay-bound)
PROJECT LOCATION

Magallanes, Makati City

PROJECT MAP


  • IMPLEMENTING AGENCY: Department of Public Works and Highways (DPWH) - NCR
  • CONTACT PERSON: Call Reynaldo G. Tagudando at +63 2 304 3700
  • CONTRACTOR: J.D. Legaspi Construction
  • CONSTRUCTION PERIOD
    • Phase 2A: Jan 2014 - May 2015
    • Phase 2B: Apr 2014 - Oct 2015