Thursday, March 17, 2022

TUGADE TO UNVEIL FIRST 8 OUT OF 104 NSCR TRAIN CARS, TO SIGN CONTRACT FOR 304 MORE TRAIN CARS

VALENZUELA, METRO MANILA - Continuing its record-breaking streak, the massive North-South Commuter Railway (NSCR) System will reach two milestones on Friday, 18 March 2022, with the unveiling of the first 8 out of 104 NSCR train cars (13 8-car train sets) ordered last July 2019, and the back-to-back contract signing for an additional 304 train cars (38 8-car train sets) for the 147-kilometer NSCR System.


Led by Transportation Secretary Art Tugade, DOTr and PNR will unveil the NSCR's first 8-car train set, which was ordered from the Japan Transport Engineering Company (J-TREC) and Sumitomo Corporation, manufactured in Yokohama, Japan, and designed to comply with both Japanese and international standards.


The NSCR's train sets are designed to operate at up to 120 kilometers per hour, shortening the travel time from Clark International Airport in Pampanga to Calamba in Laguna from more than 4 hours down to less than 2 hours.


After decades of attempts starting as early as 1994, the 38 kilometer PNR Clark 1 and 53 kilometers PNR Clark 2 segments of the 147-kilometer NSCR System are finally ongoing full-blast construction.


With 35 stations spanning 28 Local Government Units (LGU) from Mabalacat, Pampanga to Calamba, Laguna, the NSCR System is expected to serve over a million passengers per day. During construction, the project is expected to create around 50,000 direct jobs and 110,000 indirect jobs, with an additional 8,000 jobs created when the railway line starts full operations.


The NSCR System is the Duterte Administration’s single largest flagship project under the Build Build Build Program, which aims to move more people, provide more comfortable travel, and boost inclusive regional growth.

No comments:

Post a Comment