Project Background
The Integrated Luzon Railway Project (ILRP) is part of the Government of the Philippines’ (GOP’s) efforts to promote inclusive and regional growth; the Project aims to revive the railway via Public-Private partnership (PPP) to provide improved public transport along the North-South transit corridor of Mega Manila and NCR, and the whole of Luzon in the future.
Government of The Philippines has recognized the potential of its rail network to reduce traffic congestion and improve quality of life in the city and neighboring provinces. Currently, the rail service offered by the Philippine National Railways (PNR) is limited to the commuter line from Tutuban, Manila to Sta. Rosa, Laguna and a short corridor within Bicol. PNR was offering train services from Manila to Naga City, Camarines Sur, but the operation has been suspended since late 2012.
The Department of Transportation and Communications (DOTC) is eyeing a plan for an elevated railway that will go from Malolos, Bulacan all the way to Los Banos, Laguna.
In an interview on DZMM’s “Failon Ngayon” aired last July 22, 2013, Transportation Secretary Joseph Emilio Abaya said there is an on-going feasibility study (FS) for this elevated railway project.
“Basically yung PNR (Philippine National Railways) na nakikita namin, itong Mega Manila na tinatawag mula sa Bulacan hanggang sa may bandang Laguna, itong elevated railway na hanggang Malolos to Calamba possibly Los Banos, on-going naman yung FS dyan,” he said.
He noted the feasibility study is expected to be finished by the first quarter of 2014, after which it will be submitted to the National Economic and Development Authority.
The DOTC is currently evaluating if the project would be funded through the Public-Private Partnership program, which Abaya views as an opportunity for the public-private sector to be part of the infrastructure development of the country.
"Mai-akyat na namin sa NEDA para mai-approve at magawan ng structure, whether PPP or ang pamahalaan ang magpapagawa nito at gagastos," he said.
"However, kung ang bansa ay may pera at mura ang pag-uutang, mukhang nakikita naming mas mabilis gumastos through the national budget dahil walang pribadong sektor na kailangan mong I-negotiate at siguraduhing na mayroon silang kikitain."
The Integrated Luzon Railway Project (ILRP) is part of the Government of the Philippines’ (GOP’s) efforts to promote inclusive and regional growth; the Project aims to revive the railway via Public-Private partnership (PPP) to provide improved public transport along the North-South transit corridor of Mega Manila and NCR, and the whole of Luzon in the future.
Government of The Philippines has recognized the potential of its rail network to reduce traffic congestion and improve quality of life in the city and neighboring provinces. Currently, the rail service offered by the Philippine National Railways (PNR) is limited to the commuter line from Tutuban, Manila to Sta. Rosa, Laguna and a short corridor within Bicol. PNR was offering train services from Manila to Naga City, Camarines Sur, but the operation has been suspended since late 2012.
The Department of Transportation and Communications (DOTC) is eyeing a plan for an elevated railway that will go from Malolos, Bulacan all the way to Los Banos, Laguna.
In an interview on DZMM’s “Failon Ngayon” aired last July 22, 2013, Transportation Secretary Joseph Emilio Abaya said there is an on-going feasibility study (FS) for this elevated railway project.
“Basically yung PNR (Philippine National Railways) na nakikita namin, itong Mega Manila na tinatawag mula sa Bulacan hanggang sa may bandang Laguna, itong elevated railway na hanggang Malolos to Calamba possibly Los Banos, on-going naman yung FS dyan,” he said.
He noted the feasibility study is expected to be finished by the first quarter of 2014, after which it will be submitted to the National Economic and Development Authority.
The DOTC is currently evaluating if the project would be funded through the Public-Private Partnership program, which Abaya views as an opportunity for the public-private sector to be part of the infrastructure development of the country.
"Mai-akyat na namin sa NEDA para mai-approve at magawan ng structure, whether PPP or ang pamahalaan ang magpapagawa nito at gagastos," he said.
"However, kung ang bansa ay may pera at mura ang pag-uutang, mukhang nakikita naming mas mabilis gumastos through the national budget dahil walang pribadong sektor na kailangan mong I-negotiate at siguraduhing na mayroon silang kikitain."
Abaya estimated the elevated railway project will take between four to five years to construct.
Location
Existing Facilities on the PNR Mainline South
Location
- The ILRP covers the abandoned Mainline North from Metro Manila to San Fernando, La Union and the suspended Mainline South from Tutuban, Manila, Metro Manila to Legaspi City, Albay. It also includes the abandoned spur lines to the North from San Jose, Nueva Ecija to Cagayan and from Legaspi City, Albay to Matnog, Sorsogon, as well as the possible revival of the Batangas line.
- The North-South Commuter Railway (NSCR) alignment is the first phase of this project. This alignment will run from Malolos City, Bulacan to Calamba City, Laguna using the PNR ROW.
- Mainline North would be a revival development while Mainline South could be the rehabilitation the existing PNR line or the construction of a new line.
Stations
Mainline North
- Laoag (proposed) - Laoag
- Paoay (proposed) - Paoay
- Batac (proposed) - Batac City
- Vigan (proposed) - Vigan
- Santa (proposed) - Santa
- Candon (proposed) - Candon City
- Sudipen - Sudipen (The line was extended here during the Japanese Occupation)
- Quirino - Brgy. Quirino, Bacnotan
- Maragayap - Brgy. Maragayap, Bacnotan
- Santa Cruz - Brgy. Santa Cruz, Bacnotan
- Bulala - Brgy. Bulala, Bacnotan
- Bacnotan - Bacnotan (Terminus since 1955)
- Baroro - Brgy. Baroro, Bacnotan
- Taboc - Brgy. Taboc, San Juan
- San Juan - San Juan, La Union
- Bato - Brgy. Bato, San Juan
- Mameltac - Brgy. Saoay, San Fernando
- Biday - Brgy. Biday, San Fernando
- San Fernando (San Fernando U) - San Fernando City
- Junction - Brgy. Catbangen, San Fernando
- Romas - Brgy. Paringay, Bauang
- Bauang - Bauang
- Bauang Sur - Brgy. Calumbaya, Bauang
- Santiago - Brgy. Santiago, Bauang
- Urayong - Brgy. Urayong, Bauang
- Caba (Cava) - Caba
- Aringay - Aringay [Terminus for the Aringay-Baguio Line]
- Agoo - Agoo
- Santo Tomas (Santo Tomas U) - Santo Tomas
- Cupang - Brgy. Cupang, Santo Tomas
- Damortis - Brgy. Damortis, Rosario [terminus for car/bus shuttle service to Baguio City via Kennon Road]
- Alacan - Brgy. Alacan, San Fabian
- San Fabian - San Fabian [Terminus for the San Fabian-Camp One/San Fabian-Binday branch]
- Mangaldan - Mangaldan
- Dagupan - Brgy. Mayombo, Dagupan City
- Calasiao - Calasiao (ruins)
- Buenlag - Brgy. Buenlag, Calasiao
- San Carlos - San Carlos City
- Malasiqui - Malasiqui
- Bayambang - Bayambang
- Bautista - Bautista
- Poponto - Brgy. Poponto, Bautista
- Moncada - Moncada (ruins)
- Paniqui - Paniqui
- Gerona - Gerona (ruins)
- Parsolingan - Brgy. Parsolingan, Gerona
- Tarlac City - Tarlac City Proper, Tarlac City
- San Miguel - Brgy San Miguel, Tarlac City
- Murcia (San Agustin) - Concepcion, Tarlac
- Capas - Capas (Museum for the Death March)
- Bamban (Bambang) - Bamban (ruins)
- Mabalacat - Mabalacat
- Dau - Brgy. Dau, Mabalacat
- Clark International Airport (proposed) - Clark International Airport, Clark Special Economic Zone, Angeles City
- Clark Disneyland (proposed) - Clark Special Economic Zone, Angeles City
- Balibago - Brgy. Balibago, Angeles City (Main gate - Clark Special Economic Zone)
- Angeles (Culiat) - Angeles City (ruins)
- Calulut - Brgy. Calulut, San Fernando City
- San Fernando (San Fernando P) - San Fernando City (restored)
- Santo Tomas - Santo Tomas, Pampanga (ruins)
- Apalit - Apalit
- Sulipan - Brgy. Sulipan, Apalit
- Calumpit - Calumpit
- Malolos - near the Bulacan Provincial Capitol, Malolos City
- Guiguinto - Guiguinto
- Balagtas (Bigaa) - Balagtas
- Bocaue (Bocaue) - Bocaue (ruins)
- Marilao - Marilao
- Meycauayan - Meycauayan City
- Tarlac-San Jose branch railway line
- Tarlac City - Tarlac City, Tarlac
- Victoria - Victoria, Tarlac
- Subol - Brgy. Subol, Guimba, Nueva Ecija
- Bantug - Brgy. Bantung, Guimba, Nueva Ecija
- Guimba - Guimba, Nueva Ecija
- Matarano - Brgy. Mataranoc, Gumimba
- Cabaruan - Brgy. Cabaruan, Guimba
- Gabaldon - Brgy. Gabaldon, Muñoz
- Palosapis - Brgy. Palosapis, Muñoz
- Muñoz (Muñoz-Talavera) - Science City of Muñoz
- Central Luzon Agricultural College - Central Luzon State University, Muñoz
- San Jose - San Jose City (ruins)
- Cordon - Cordon, Isabela
- Santiago - Santiago City, Isabela
- Echague (proposed) - Echague, Isabela [original terminus planned in 1946 and extended to Tuguegarao]
- Enrile - Enrile, Cagayan
- Tuguegarao (proposed) - Tuguegarao, Cagayan
Balagtas-Cabanatuan branch railway line
- Balagtas (Bigaa) - Balagtas
- Plaridel - Plaridel
- Pulilan - Pulilan
- Baliuag - Baliuag
- Maasim - Brgy. Maasim, San Ildefonso
- San Ildefonso - San Ildefonso
- San Miguel (San Miguel Mayumo) - San Miguel
- Pinambaran - Brgy. Pinambaran, San Miguel, Bulacan
- Baluarte - Brgy. Balaurte, Bulacan
- San Isidro - San Isidro
- Gapan - Gapan
- Peñaranda - Peñaranda
- Santa Rosa - Santa Rosa
- Cabanatuan - Cabanatuan
Fort Stotsenburg-Magalang branch railway
line
- Stotsenburg - Sapang Bato, Angeles
- Dau - Brgy. Dau, Mabalacat, Pampanga
- Magalang - Magalang, Pampanga
Arayat-Carmen branch railway line
- Arayat - Arayat, Pampanga
- Sta. Ana - Brgy. Sta. Ana, Mexico, Pampanga
- Mexico - Mexico
- San Fernando - San Fernando, Pampanga
- Pasudeco - Brgy. Santo Niño, San Fernando
- Bacolor - Bacolor, Pampanga
- Cabetican - Brgy. Cabetican, Bacolor
- Guagua - Guagua, Pampanga
- Santa Monica - Brgy. Santa Monica, Lubao
- Lubao - Lubao, Pampanga
- San Matias - Brgy. San Matias, Lubao
- Concepcion - Brgy. Concepcion, Lubao
- San Francisco - Brgy. San Francisco, Lubao
- Floridablanca - Floridablanca, Pampanga
- Paguiruan - Brgy. Paguiruan, Floridablanca
- Del Carmen (Carmen) - Brgy. Del Carmen, Floridablanca
Tayug branch
- Paniqui - Paniqui
- Nampicuan - Nampicuan
- Cuyapo - Cuyapo
- Bued - Brgy. Bued, Cuyapo
- Rosales - Rosales
- Santa Maria - Santa Maria
- Tayug - Tayug
- Cabalitian - Brgy. Cabalitian, Umingan
- San Quintin - San Quintin
Existing Facilities on the PNR Mainline South
- PNR Mainline South consists of a double standard gauge track which runs a total of 478 kilometers from Manila to Legazpi City, Albay.
- There are about 430 existing bridge structures, 45 stations and 43 flag stops along the Mainline South.
Stations
Other related projects: North-South Commuter Railway (NSCR)
- Caloocan (Kalookan) - Sangandaan, Caloocan City
- Asistio Avenue - Grace Park, Caloocan City
- C-3 (5th Ave) - Grace Park, Caloocan City
- Solis - Tondo, Manila
- Tayuman - Tayuman Street, Tondo, Manila
- Tutuban (Manila/Tondo) - Tondo, Manila
- Blumentritt (San Lazaro/Santa Cruz) - Sampaloc,Manila
- Laong Laan (Dapitan) - Sampaloc, Manila
- España - Sampaloc, Manila
- Sampaloc - Sampaloc, Manila
- Legarda - Sampaloc, Manila
- Santa Mesa - Santa Mesa, Manila (beside Polytechnic University of the Philippines)
- Pandacan (Beata) - Pandacan, Manila
- Paco - Paco, Manila
- San Andres - San Andres, Manila
- Vito Cruz - San Andres, Manila
- Buendia - Brgy. Pio del Pilar, Makati City
- Pasay Road (Culi-culi/Pio del Pilar) - Brgy. Pio del Pilar, Makati City
- EDSA - Magallanes Village, Makati City
- Nichols (Bonifacio-Villamor) - Brgy. Western Bicutan, Taguig City
- Balagbag - Balagbag, Pasay City
- FTI - (Balagbag) Brgy. Western Bicutan, Taguig City
- Philippine-American Embroidery - Brgy. San Martin de Porres, Parañaque City
- Bicutan - Brgy. San Martin de Porres, Parañaque City
- Bagumbayan - Brgy. Bagumbayan, Taguig City
- Batisan - Brgy. Bagumbayan, Taguig City
- Sucat - Sucat, Muntinlupa City
- Buli (Cupang) - Brgy. Cupang
- Alabang - Alabang, Muntinlupa City
- Muntinlupa - Poblacion, Muntinlupa City
- Tunasan - Tunasan, Muntinlupa City
- San Pedro (San Pedro Tunasan) - San Vicente, San Pedro [abandoned Terminus for the San Pedro-Carmona branch line]
- Pacita Complex - Pacita Complex, San Pedro
- Golden City 1 - Golden City Subdivision, Biñan City
- Biñan (Biñang) - Biñan City
- Santa Rosa - Brgy. Labas, City Proper, Santa Rosa City
- Golden City 2 - Golden City Subdivision, Santa Rosa City
- Cabuyao - near Asia Brewery, Inc. Manufacturing Plant, Cabuyao City
- Mamatid - Brgy. Mamatid, Cabuyao City [Terminus for the Mamatid-Canlubang Line]
- Banlic - Brgy. Banlic, Cabuyao City
- Calamba - Brgy. 1, Calamba City [Terminus for the Calamba-Batangas branch line]
- Pansol - Brgy. Pansol, Calamba
- Masili - Brgy. Masili, Calamba
- Los Baños - Brgy. Bambang, Los Baños
- UP Los Baños (Junction/College) - University of the Philippines, Brgy. Batong Malake, Los Baños [Terminus for the UP Los Baños-Sta. Cruz branch line]
- Masaya - Brgy. Masaya, Bay
- San Crispin - Brgy. San Crispin, San Pablo
- San Pablo - San Pablo City
- Tiaong (Tiaon) - Tiaong
- Lusacan - Brgy Lusacan, Tiaong
- Candelaria - Candelaria
- Lutucan - Barangay Lutucan, Sariaya
- Sariaya - Sariaya
- Conception - Brgy. Conception, Sariaya
- Lucena - South City Proper, Lucena City
- Mayao - Brgy. Mayao, Lucena
- Castillo - Brgy. Castillo, Pagbilao
- Pagbilao - Pagbilao
- Pinagbayanan - Brgy. Pinagbayanan, Pagbilao
- Palsabangon - Brgy. Ibabang Palsabangon, Pagbilao
- Binahaan - Brgy. Binahaan, Pagbilao
- Malicboy - Brgy. Malicboy, Pagbilao
- Sipa - Brgy. Sipa, Pagbilao
- Hinguiwin - Brgy. Hinguiwin, Padre Burgos
- Padre Burgos (Laguimanoc) - Padre Burgos
- Marao - Brgy. Marao, Padre Burgos
- Pinaninding - Brgy. Danlagan, Padre Burgos
- San Isidro - Brgy. San Isidro, Padre Burgos
- Walay - Brgy. Walay, Padre Burgos
- Cabuyao - Brgy. Cabuyao Sur, Padre Burgos [flag stop]
- Agdangan - Agdangan
- Panaon - Brgy. Panaon, Unisan
- Poctol - Brgy. Poctol, Unisan
- Atimonan (Summit) - Brgy. Inalig, Atimonan
- Plaridel (Siain) - Plaridel
- Inaclagan - Brgy. Inaclagan, Gumaca
- Gumaca - Gumaca
- Panikihan - Brgy. Panikihan, Gumaca
- Bamban - Brgy. Bamban, Gumaca
- Hagakhakin - Brgy. Hagakhakin, Gumaca
- San Vicente - Brgy. San Vicente, Gumaca
- Pansol - Brgy. Pansol Lopez
- Lopez - Lopez
- Santa Lucia - Brgy. Santa Lucia, Lopez
- Hondagua - Brgy. Hondagua, Lopez
- Calauag - Brgy. Santa Maria, Calauag
- Sumulong - Brgy. Sumulong, Calauag
- Santo Domingo - Brgy. Santo Domingo, Calauag
- Danlagan - Brgy. Danlagan Reserva, Guinayangan
- Aloneros - Brgy. Aloneros, Guinayangan
- Cabugwang - Brgy. Cabugwang, Tagkawayan
- Manato - Brgy. Manato station, Tagkawayan
- New Aloneros - Brgy. Manato station, Tagkawayan
- Mangayao - Brgy. Mangayao, Tagkawayan
- Katimo - Brgy. Katimo, Tagkawayan
- Buyabod - Brgy. Buyabod, Tagkawayan
- Kinatakutan - Brgy. Kinatakutan, Tagkawayan
- Laurel - Brgy. Laurel, Tagkawayan
- Aliji - Brgy. Aliji, Tagkawayan
- Morato - Brgy. Morato, Tagkawayan
- Tagkawayan - Tagkawayan
- Del Gallego - Del Gallego
- San Juan - Brgy. San Juan, Del Gallego
- Sinuknipan - Brgy. Sinuknipan, Del Gallego
- Catabangan (Godofredo Reyes Sr.) - Brgy. Godofredo Reyes Sr. (Catabangan Junction), Ragay
- Port Junction - Brgy. Port Junction, Ragay
- Fort Simeon (Pugod) - Brgy. Fort Simeon, Ragay
- Liboro - Brgy. Liboro, Ragay
- Ragay - Ragay
- Naghoom - Brgy. Naghoom, Ragay
- Banga Caves - Brgy. Banga Caves, Ragay
- Del Rosario - Brgy. Colacling (Del Rosario), Lupi [flag stop]
- Lupi Viejo - Lupi [flag stop]
- Lupi Nuevo - Brgy. Tapi, Lupi
- Manangle - Brgy. Manangle, Sipocot
- Malaguico - Brgy. Malaguico, Sipocot
- Azucena - Brgy. Azucena, Sipocot
- Sipocot - Sipocot
- Awayan - Brgy. Awayan, Sipocot [flag stop]
- Mantalisay - Brgy. Mantalisay, Libmanan [flag stop]
- Camambugan - Brgy. Camambugan, Libmanan [flag stop]
- Libmanan - Libmanan
- Rongos - Brgy. Rongos, Libmanan [flag stop]
- Malansad - Brgy. Malansad, Libmanan [flag stop]
- Mambulo - Brgy. Mambulo Viejo, Libmanan [flag stop]
- Pamplona - Pamplona
- Burabod - Brgy. Burabod, Pamplona [flag stop]
- Sampaloc - Brgy. Sampaloc, Gainza [flag stop]
- Naga - Brgy. Triangulo, Naga City
- San Antonio - Brgy. San Antonio, Milaor
- Maycatmon - Brgy. Maycatmon, Milaor
- San Jose - Brgy. San Jose, Pili
- Pili - Pili
- Bula - Bula
- Agdangan - Brgy. Agdangan, Baao
- Baao - Baao
- Iriga - Iriga City
- Lourdes Old - Brgy. Lourdes Old, Nabua
- Lourdes Young - Brgy. Lourdes Young, Nabua
- Bato - Bato
- Matacon - Brgy. Matacon, Polangui [flag stop]
- Santicon - Brgy. Santicon, Polangui
- Apad - Brgy. Apad, Polangui
- Polangui - Polangui
- Oas - Oas
- Ligao - Ligao City
- Inascan - Brgy. Inascan, Guinobatan
- Guinobatan - Brgy. Masarawag, Guinobatan
- Travesia - Brgy. Travesia, Guinobatan, Albay|Guinobatan
- Camalig - Camalig [Abandoned because of a diversion line built by the PNR to alleviate the original high gradient, lava affected section between Camalig and Daraga]
- Comun - Brgy. Comun, Daraga
- Daraga - Brgy. Sagpon, Daraga
- Albay - Brgy. 16 Kawit-East Washington Drive, Legazpi
- Legazpi (Legaspi) - Legazpi City [Terminus for the Legazpi-Tabaco Line]
Legazpi-Tabaco branch
- Legazpi - Legazpi
- Santo Domingo (Libog) - Santo Domingo, Albay
- Bacacay - Bacacay
- Malilipot - Malilipot
- Tabaco - Tabaco
Other related projects: North-South Commuter Railway (NSCR)
- The NSCR line will cater mostly to commuters of Greater Metro Manila. It is a 141.2 (80.2 (NorthRail phase 1) + 59.9 (SouthRail) kilometer commuter and rapid railway transit system. The NSCR proposes sixty-four (64) passenger stations, four (4) of which are interchange stations: Blumentritt (LRT Line 1), Santa Mesa (LRT 2), and EDSA (MRT Line 3) and the I-T-S (Integrated Transportation System) provincial bus terminal located at FTI (Food Terminal Inc.), Taguig City. An office and railway depot of about 30 hectares will be constructed in Marilao, Bulacan.
- The new commuter rail facility is envisioned to use train sets of 4 cars each at a maximum running speed of 120 kilometers/hour.
- In addition, a depot will be constructed in Marilao, Bulacan, approximately 30 hectares to provide maintenance works and accommodate larger fleet of trains.
- The indicative project cost for NSCR will be P271.19 billion.
- Phase 2 of this project will include rail services between Clark Special Economic Zone, Angeles City, Pampanga and Manila International Airport.
Stations
Project
- Clark International Airport (proposed) - Clark International Airport, Clark Special Economic Zone, Angeles City
- Clark Disneyland (proposed) - Clark Special Economic Zone, Angeles City
- Balibago - Brgy. Balibago, Angeles City (Main gate - Clark Special Economic Zone)
- Angeles (Culiat) - Angeles City
- Calulut - Brgy. Calulut, San Fernando City
- San Fernando (San Fernando P) - San Fernando City (restored)
- Santo Tomas - Santo Tomas, Pampanga (ruins)
- Apalit - Apalit
- Sulipan - Brgy. Sulipan, Apalit
- Calumpit - Calumpit
- Malolos - near the Bulacan Provincial Capitol, Malolos City
- Guiguinto - Guiguinto
- Balagtas (Bigaa) - Balagtas
- Bocaue (Bocaue) - Bocaue
- Marilao - Marilao
- Meycauayan - Meycauayan City
- Caloocan (Kalookan) - Sangandaan, Caloocan City
- Asistio Avenue - Grace Park, Caloocan City
- C-3 (5th Ave) - Grace Park, Caloocan City
- Solis - Tondo, Manila
- Tayuman - Tayuman Street, Tondo, Manila
- Tutuban (Manila/Tondo) - Tondo, Manila
- Blumentritt (San Lazaro/Santa Cruz) - Sampaloc, Manila
- Laong Laan (Dapitan) - Sampaloc, Manila
- España - Sampaloc, Manila
- Sampaloc - Sampaloc, Manila
- Legarda - Sampaloc, Manila
- Santa Mesa - Santa Mesa, Manila (beside Polytechnic University of the Philippines)
- Pandacan (Beata) - Pandacan, Manila
- Paco - Paco, Manila
- San Andres - San Andres, Manila
- Vito Cruz - San Andres, Manila
- Buendia - Brgy. Pio del Pilar, Makati City
- Pasay Road (Culi-culi/Pio del Pilar) - Brgy. Pio del Pilar, Makati City
- EDSA - Magallanes Village, Makati City
- Nichols (Bonifacio-Villamor) - Brgy. Western Bicutan, Taguig City
- Balagbag - Balagbag, Pasay City
- FTI - (Balagbag) Brgy. Western Bicutan, Taguig City
- Philippine-American Embroidery - Brgy. San Martin de Porres, Parañaque City
- Bicutan - Brgy. San Martin de Porres, Parañaque City
- Bagumbayan - Brgy. Bagumbayan, Taguig City
- Batisan - Brgy. Bagumbayan, Taguig City
- Sucat - Sucat, Muntinlupa City
- Buli (Cupang) - Brgy. Cupang
- Alabang - Alabang, Muntinlupa City
- Muntinlupa - Poblacion, Muntinlupa City
- Tunasan - Tunasan, Muntinlupa City
- San Pedro (San Pedro Tunasan) - San Vicente, San Pedro
- Pacita Complex - Pacita Complex, San Pedro
- Golden City 1 - Golden City Subdivision, Biñan City
- Biñan (Biñang) - Biñan City
- Santa Rosa - Brgy. Labas, City Proper, Santa Rosa City
- Golden City 2 - Golden City Subdivision, Santa Rosa City
- Cabuyao - near Asia Brewery, Inc. Manufacturing Plant, Cabuyao City
- Mamatid - Brgy. Mamatid, Cabuyao City [Terminus for the Mamatid-Canlubang Line]
- Banlic - Brgy. Banlic, Cabuyao City
- Calamba - Brgy. 1, Calamba City [Terminus for the Calamba-Batangas branch line]
- Pansol - Brgy. Pansol, Calamba
- Masili - Brgy. Masili, Calamba
- Los Baños - Brgy. Bambang, Los Baños
- UP Los Baños (Junction/College) - University of the Philippines, Brgy. Batong Malake, Los Baños [Terminus for the UP Los Baños-Sta. Cruz branch line]
- Masaya - Brgy. Masaya, Bay
- San Crispin - Brgy. San Crispin, San Pablo
- San Pablo - San Pablo City
San Pedro-Carmona
- San Pedro - San Vicente, San Pedro
- Chrysanthemum Village - San Pedro
- Carmona - San Pedro
Cabuyao-Eton City branch
Mamatid-Buntog branch
- Mamatid - Mamatid, Cabuyao City
- Mayapa - Brgy. Mayapa, Calamba, Laguna
- Canlubang - Canlubang, Calamba
- Locomotive - Canlubang, Calamba
- Buntog - Sitio Buntog, Canlubang, Calamba
Calamba-Bauan branch
- Calamba - Brgy. 1, Calamba City
- Makiling - Brgy. Makiling, Calamba
- Santo Tomas - Santo Tomas
- Tanauan - Tanauan City
- Malvar (Luta) - Brgy. Poblacion, Malvar, Batangas [Terminus for the San Pablo-Malvar Line]
- Lipa - Lipa City
- Padre Garcia (proposed) - Padre Garcia
- San Jose - San Jose, Batangas
- Batangas - near the Batangas Provincial Capitol
- Bauan - Bauan
UP Los Baños-Santa Cruz branch
- UP Los Baños - Barangay Batong Malake, Los Baños
- Bay - Bay
- Victoria (Dayap) - Victoria
- Manaol - Brgy. Manaol, Nagcarlan
- Banca-Banca - Brgy. Banca-Banca, Nagcarlan
- Calumpang - Brgy. Calumpang, Nagcarlan
- Magdalena - Magdalena
- Cabanbanan (Buboy) - Brgy. Pagsawitan, Santa Cruz
- Pagsawitan - Brgy. Pagsawitan, Santa Cruz
- Santa Cruz - near the Laguna Provincial Capitol, Santa Cruz
- Pagsanjan - Town Proper, Pagsanjan
San Pablo-Malvar Branch Railway Line
- San Pablo - San Pablo City
- Santa Monica - Brgy. Santa Monica, San Pablo
- Magampon - San Pablo
- Alaminos - Alaminos, Laguna
- San Andres - Brgy. San Andres, Alaminos
- San Joaquin - Brgy. San Joaquin, Santo Tomas, Batangas
- Camballo - Brgy. San Francisco, Santo Tomas
- Salvarrol - Brgy. San Francisco, Santo Tomas
- Malvar (Luta) - Malvar, Batangas
Project
a. Concession Scope
While the transaction structure is presently being developed, the following concession scope currently being explored is as follows:
- NSCR
- Construction of 89.7km double-track standard gauge commuter rail line (i.e. elevated, viaduct, underground and at-grade structures, depot)
- Supply of rolling stock
- Installation of electro-mechanical systems
- Operations and maintenance of the NSCR Line
- Mainline South and Extension
- Rehabilitation of existing Mainline South Railway (bridges, track, signaling, civil works)
- Construction of new extension line to Matnog, Sorsogon
- Reconstruction of branch line to Batangas
- Operation and maintenance of the Mainline South Railway and extensions
- Supply of rolling stock; refitting of old rolling stock
- Mainline North and Extension
- Reconstruction of new double-track standard gauge railway on Mainline North railbed
- Construction of new extension to Tuguegarao, Cagayan
- Supply of standard gauge rolling stock (DMUs, freight locos and wagons)
- Operation and maintenance of the Mainline North Railway and extensions
- Operation of freight railway
B. Indicative
Schedule
1.
Tender
Process / Status for NSCR (or First Stage of ILRP)
The
transaction process is likely to be undertaken in 2 stages: a)
pre-qualification of prospective bidders and b) selection of preferred bidder.
Milestone
|
Indicative Timeline
|
Request for Qualifications / Invitation to
Prequalify and Bid
|
3rd Quarter 2014
|
Qualification Documents Submission
|
4th Quarter 2014
|
Issuance of Bid Documents
|
4th Quarter 2014
|
Submission of Bid Documents
|
3rd Quarter 2015
|
Issuance of Notice of Award
|
3rd Quarter 2015
|
Signing Date of Concession Agreement and
Compliance with other requirements
|
4th Quarter 2015
|
No comments:
Post a Comment