Guangzhou Metro officially released the construction progress of 12 (section) new rail transit lines in September of 2020

 1. North Extension of Line 8: 93%

The total length of the line is 16.1 kilometers, all of which are underground lines, with a total of 13 stations


The entire line of vehicles adopts 6-carriage A-type vehicles with a maximum operating speed of 80 km/h.


2. West Extension of Line 7: 77%

The length of the line is 13.45 kilometers (of which the Shunde section is about 11.8 kilometers long and the Guangzhou section is about 1.65 kilometers long).


The vehicle adopts a 6-carriage B-type vehicle with a maximum operating speed of 80 km/h.


3. Line 11: 39%

The total length of the line is about 44.2 kilometers, all of which are laid underground. There are 32 stations on the whole line. In addition, one station (Urban Rail Pazhou Station) will be built on behalf of it, including 20 transfer stations and 1 Chisha depot.


The vehicles are composed of 8-carriage A-type vehicle with a maximum operating speed of 80 km/h.


4. Line 18: 80%

The line has a total length of 61.3 kilometers, all of which are underground lines, with 9 stations, including 8 transfer stations.


The design speed of the vehicle is 160 km/h.


5. Line 22: 52%

The line has a total length of 30.8 kilometers, all of which are underground lines, with a total of 8 stations, including 4 transfer stations.


The design speed of the vehicle is 160 km/h.


6. Line 13 Phase II: 18%

The line has a total length of 33.5 kilometers, all of which are underground lines. There are 23 stations (all underground stations), one of which is constructed by Line 11, including 9 transfer stations.


The vehicle adopts an 8-carriage A-type vehicle with a maximum operating speed of 100 km/h.


7. East Extension of Line 3: 11%

The total length of the line is about 9.55 kilometers, with 4 stations, including 1 transfer station and 1 Guangzhou Xincheng parking lot.


The vehicle adopts a 6-carriage B-type vehicle with a maximum operating speed of 120 km/h.


8. East Extension of Line 5: 7%

The line has a total length of 9.8 kilometers and has 6 stations (excluding Wenchong Station), including 2 transfer stations and 1 Shuanggang parking lot.


The vehicle adopts a 6-carriage L-type car with a maximum operating speed of 90 km/h.


9. Line 7 Phase II: 21%

The total length of the line is 21.9 kilometers, all of which are laid underground. There are 11 stations in total, including 8 transfer stations and 1 Shangtang parking lot.


The vehicle adopts a 6-carriage B-type vehicle with a maximum operating speed of 80 km/h.


10. Line 10: 8%

The total length of the line is about 19.15 kilometers, with 14 stations, all of which are underground stations, including 10 transfer stations


The vehicle adopts a 6-carriage B-type vehicle with a maximum operating speed of 80 km/h.


11. Line 12: 11%

The No. 12 line is 37.6 kilometers long and is all underground. There are 25 stations, 6 of which are constructed by other lines, of which 17 are transfer stations.


The vehicle adopts a 6-carriage type A vehicle with a maximum operating speed of 80 km/h.


12. Line 14 Phase II: 9%


The length of the line is 11.9 kilometers, all of which are underground lines, with a total of 8 stations, including 3 transfer stations.


The vehicle adopts a 6-carriage B-type vehicle with a maximum operating speed of 120 km/h.